Home / Oxford Space Systems

Case Study

Oxford Space Systems

Harwell Campus

Oxford Space Systems

In 2019, Total Laboratories transformed a warehouse into a two-story laboratory and office complex. The centrepiece is a 7m-high prefabricated “Class 7 Clean Room” with a 20m x 25m footprint, featuring an overhead gantry crane. Class 7 Clean Rooms must maintain 60-150 air changes per hour and air cleanliness levels of up to 10,000 particles (≥0.5μm) per cubic foot. Due to its size and occupancy (13,000 cubic feet and 10 personnel), the clean room requires complex HEPA filtration, air changes and fume extraction. It needs sealed aluminium panels for containment and an airlock changing room.

Proposed additions include a second staircase, lift, kitchenette, breakout area, boardroom, meeting rooms, and new WCs.

Oxford Space Systems

Harwell Campus

Design & Build

Laboratory

£1,700,000

23 Weeks

2019

Do you have some questions about how we work?

If you have any questions in regard to our health and safety practices or maybe how a office renovation could disrupt your current working environment, contact us today.

Craig Cresswell

Craig Cresswell

Senior Estimator

Contact Us

Are you ready to transform your commercial space?

Be inspired by our other projects

Amano Enzyme

Amano Enzyme

Learn more
Wild Bioscience

Wild Bioscience

Learn more
REVVITY

REVVITY

Learn more
Intuitive Surgical

Intuitive Surgical

Learn more