Case Study
Oxford Space Systems
Harwell Campus
Oxford Space Systems Case Study
In 2019, Total Laboratories transformed a warehouse into a two-story laboratory and office complex. The centrepiece is a 7m-high prefabricated “Class 7 Clean Room” with a 20m x 25m footprint, featuring an overhead gantry crane. Class 7 Clean Rooms must maintain 60-150 air changes per hour and air cleanliness levels of up to 10,000 particles (≥0.5μm) per cubic foot. Due to its size and occupancy (13,000 cubic feet and 10 personnel), the clean room requires complex HEPA filtration, air changes and fume extraction. It needs sealed aluminium panels for containment and an airlock changing room.
Proposed additions include a second staircase, lift, kitchenette, breakout area, boardroom, meeting rooms, and new WCs.
Scroll down to view images of the completed project and if you have any questions about our work and how we can help to create a bespoke laboratory space for you, just get in touch!
Oxford Space Systems
Harwell Campus
Design & Build
Laboratory
£1,700,000
23 Weeks
2019
Do you have some questions about how we work?
If you have any questions in regard to our health and safety practices or maybe how a office renovation could disrupt your current working environment, contact us today.